PMP, CAPM, Scrum, Six Sigma & ITIL 4: practice drill
10 realistic exam questions, graded as you go, with the exact rule or statute citation for every answer. Start free, no sign-up.
Timed mock exam
11 questions in 13 minutes, drawn from every topic. No answers shown until the end, then a full score breakdown, your weakest topics and a review of what you missed.
Prices are in US dollars, plus tax where it applies. Stripe, our payment processor, calculates tax at checkout.
All sales are final. If something is really wrong, such as a duplicate charge or a purchase that does not unlock what you bought, write to support@careerexampro.com and we will put it right.
One-time payment. Nothing renews.
You have an exam ticket for this practice test. Start the timed mock exam to use it.
Exact question counts, passing scores, and allowed reference materials vary by testing window and state/agency. Always confirm current rules with the official testing provider.
Sample questions
A Six Sigma Green Belt team has already signed off its Project Charter, SIPOC diagram, and Critical-to-Quality (CTQ) tree. The team is now conducting a Measurement System Analysis (Gage R&R) and collecting baseline data to quantify current process sigma before testing root-cause hypotheses. Which DMAIC phase is the team executing?
Define, where measurement repeatability and baseline sigma are required to finalize the SIPOC diagram.
Measure, where the team validates measurement systems via MSA and establishes baseline process capability.
Analyze, where Gage R&R variance directly proves which operational root causes create customer defects.
Control, where measurement validation ensures implemented pilot improvements stay permanently sustained.
Show the answer
B. Measure, where the team validates measurement systems via MSA and establishes baseline process capability.
In the ASQ Six Sigma DMAIC methodology: Define produces the Project Charter, VOC/CTQ tree, and SIPOC; Measure maps the detailed process, validates the measurement system (MSA / Gage R&R), and establishes baseline performance/capability; Analyze identifies and statistically verifies root causes; Improve designs and pilots solutions (e.g., DOE); and Control sustains gains through Control Plans and SPC charts.
Reference: ASQ Certified Six Sigma Green Belt (CSSGB) Body of Knowledge — Section III: Measure Phase
Midway through a predictive facility upgrade, an operations director emails the project manager asking to add an unbudgeted backup generator that is outside the approved scope baseline and will add $45,000 and 10 days to the critical path. What should the project manager do FIRST?
Add the generator to the Work Breakdown Structure and fund the $45,000 cost from the contingency reserve.
Evaluate the change's full impact on constraints and submit a formal change request to the Change Control Board.
Reject the director's request immediately in writing because baseline modifications are banned after planning.
Direct the engineering lead to begin procuring the generator while awaiting verbal sponsor approval next week.
Show the answer
B. Evaluate the change's full impact on constraints and submit a formal change request to the Change Control Board.
Under PMI's Perform Integrated Change Control process (and ITIL 4 Change Enablement / Six Sigma scope governance), any change affecting approved baselines cannot be implemented unilaterally by the PM or rejected without evaluation. The PM must first analyze the full impact on scope, schedule, cost, quality, and risks, document a formal change request, and submit it to the CCB or designated change authority.
Reference: PMI Process Groups: A Practice Guide — Perform Integrated Change Control
A quality engineer tests the null hypothesis (H0) that a sterilization autoclave maintains its 121°C standard against H1 (mean != 121°C). In reality, the autoclave IS operating properly at 121°C, yet based on sample readings the engineer rejects H0 and halts manufacturing. Which statistical error occurred, and what symbol represents its probability?
Type I error (alpha, producer's risk), caused by rejecting a true null hypothesis.
Type II error (beta, consumer's risk), caused by rejecting a true null hypothesis.
Type I error (beta, consumer's risk), caused by failing to detect an actual temperature shift.
Type II error (alpha, statistical power), caused by accepting H1 when the mean truly changed.
Show the answer
A. Type I error (alpha, producer's risk), caused by rejecting a true null hypothesis.
In Six Sigma hypothesis testing, a Type I error (false positive, producer's risk) occurs when you reject a true null hypothesis (H0), and its maximum allowable probability is denoted by alpha (significance level). A Type II error (false negative, consumer's risk, probability beta) occurs when you fail to reject a false null hypothesis; statistical power equals 1 - beta.
Reference: ASQ CSSGB Body of Knowledge (IV.B) — Hypothesis Testing (Type I and Type II Errors)