Timed mock exam
11 questions in 13 minutes, drawn from every topic. No answers shown until the end, then a full score breakdown, your weakest topics and a review of what you missed.
Prices are in US dollars, plus tax where it applies. Stripe, our payment processor, calculates tax at checkout.
All sales are final. If something is really wrong, such as a duplicate charge or a purchase that does not unlock what you bought, write to support@careerexampro.com and we will put it right.
One-time payment. Nothing renews.
You have an exam ticket for this practice test. Start the timed mock exam to use it.
Exact question counts, passing scores, and allowed reference materials vary by testing window and state/agency. Always confirm current rules with the official testing provider.
Sample questions
A service desk experiencing recurring outage tickets wants first to brainstorm potential root causes across structured categories (People, Process, Technology, Environment, Materials, Measurement) and next to rank defect categories to identify the vital 20% driving roughly 80% of incident volume. Which pair of quality tools should the team apply in sequence?
A scatter diagram to brainstorm categorical root causes, followed by a control chart to sort frequencies.
A Fishbone (Ishikawa) diagram for structured brainstorming, followed by a Pareto chart for vital-few ranking.
A Pareto chart to brainstorm cause-and-effect branches, followed by a SIPOC diagram for 80/20 prioritization.
A histogram to map root-cause categories, followed by a Gantt chart to rank outages by cumulative volume.
Show the answer
B. A Fishbone (Ishikawa) diagram for structured brainstorming, followed by a Pareto chart for vital-few ranking.
A Cause-and-Effect (Fishbone / Ishikawa) diagram visually organizes potential root causes into structured categories (such as the 6Ms) during team brainstorming. A Pareto chart—based on the 80/20 principle—then orders defect categories from highest to lowest frequency with a cumulative percentage line so teams focus corrective effort on the 'vital few' causes rather than the 'trivial many.'
Reference: ASQ CSSGB BOK (IV.A), PMI Quality Tools & ITIL 4 Problem Management (RCA)
Midway through a predictive facility upgrade, an operations director emails the project manager asking to add an unbudgeted backup generator that is outside the approved scope baseline and will add $45,000 and 10 days to the critical path. What should the project manager do FIRST?
Add the generator to the Work Breakdown Structure and fund the $45,000 cost from the contingency reserve.
Evaluate the change's full impact on constraints and submit a formal change request to the Change Control Board.
Reject the director's request immediately in writing because baseline modifications are banned after planning.
Direct the engineering lead to begin procuring the generator while awaiting verbal sponsor approval next week.
Show the answer
B. Evaluate the change's full impact on constraints and submit a formal change request to the Change Control Board.
Under PMI's Perform Integrated Change Control process (and ITIL 4 Change Enablement / Six Sigma scope governance), any change affecting approved baselines cannot be implemented unilaterally by the PM or rejected without evaluation. The PM must first analyze the full impact on scope, schedule, cost, quality, and risks, document a formal change request, and submit it to the CCB or designated change authority.
Reference: PMI Process Groups: A Practice Guide — Perform Integrated Change Control
In the ITIL 4 Service Value System (SVS), which central operating model converts Opportunity and Demand into Value through six interconnected activities: Plan, Improve, Engage, Design and transition, Obtain/build, and Deliver and support?
The Continual Improvement Model, which replaces operational practices with a sequential governance loop.
The Four Dimensions Framework, which translates organizational inputs directly into PESTLE constraints.
The Service Value Chain, the flexible operating model positioned at the core of the ITIL 4 SVS.
The Management Practices Catalog, which defines fixed linear workflows from intake to retirement.
Show the answer
C. The Service Value Chain, the flexible operating model positioned at the core of the ITIL 4 SVS.
The ITIL 4 Service Value System (SVS) consists of five components—Guiding Principles, Governance, Service Value Chain, Practices, and Continual Improvement—transforming Opportunity/Demand into Value. At the center of the SVS sits the Service Value Chain, a flexible operating model whose six interconnected activities (Plan, Improve, Engage, Design and transition, Obtain/build, Deliver and support) combine into value streams.
Reference: ITIL 4 Foundation (AXELOS) — Service Value System (SVS) & Service Value Chain